Starting near the Dartmouth shore the bridge deck panels (in either 20 or 10 metre lengths) will be replaced overnight.
A lifting gantry will be positioned on the suspender ropes, and the existing panel will be lowered to a barge in the harbour. A new panel will be lifted into position in the same manner. One deck panel will be replaced every three or four working nights. Weather, particularly wind, will be a concern for lowering and raising panels.
Number of deck segments successfully replaced
0 comments:
Post a Comment